Monthly Archives: 7.01.2015

 

Grupa WKN przeprowadziła repowering parku wiatrowego Weidehof

Wind farm already commissioned in 2014 At the end of 2014 the Weidehof wind farm in the district of Dithmarschen in Schleswig-Holstein was connected to the grid as scheduled within the framework of a repowering project. The former eight turbines of Vestas types V47 and V52 that had been mainly erected in 1999 were replaced […]
Posted on